Ground slab reinforcement laid out across the LAHC social housing site at Wagga Wagga NSW, excavator and site hoarding behind under a storm sky
Residential · Government · Wagga Wagga NSW

LAHC Wagga Wagga
36 Social Housing Units

Full structural reinforcement package for Zauner Construction and NSW Land and Housing Corporation, across two South Parade sites.

36UNITS
Social housing
2SITES
South Parade, Wagga
LAHC
NSW Land & Housing
ZAUNER
Head contractor
01 — The job

Thirty-six times, identically.

Thirty-six social housing units across two South Parade sites, delivered for NSW Land and Housing Corporation under the Building Homes for NSW program. MJK won the reinforcement package through tender and started on site in June 2026.

It’s a full structural scope rather than a slab package — strip footings and pier cages, lift pits, ground slabs and beams, columns, stairs and suspended slabs as the buildings go up. Every element carries its own cover, its own ligature spacing, and its own starter bars waiting on whichever trade comes next.

Across 36 units that repeats a great many times. Getting it right once is skill. Getting it identical the thirtieth time, in the same position, to the same cover, is a system.

Repetition is where reinforcement jobs are won or lost.
02 — Compliance

Built for a head contractor’s system.

Government housing work runs on documentation. Zauner administers this project through HammerTech — every worker inducted online before they set foot on site, SWMS submitted and approved per task, insurances current and verified, plant registered.

MJK completed the full onboarding before mobilising, and progress is claimed monthly against an agreed contract. For a project manager, that’s the difference between a subcontractor who fits in and one who becomes their problem.

  • Pre-qualified on a NSW Government housing project
  • HammerTech inducted — every worker, before site
  • SWMS submitted and approved per task
  • Insurances current and verified, certificates on request
  • White Card held by all crew
  • Monthly claims against an agreed contract
03 — On site

Ground level works, Site 1.

Reinforcement cage tied for a pier footing on the LAHC Wagga Wagga social housing project
Pier cage tied and squared before it goes in.
Lift pit reinforcement cage tied and set on blinding, LAHC Wagga Wagga
Lift pit steel. Cover right on every face.
Ground slab reinforcement and formwork across the Wagga Wagga social housing site with excavator working
Slab steel and formwork going down across Site 1.
Slab reinforcement mesh laid over the vapour barrier with beam cages and service penetrations set out, Wagga Wagga NSW
Slab mesh over the membrane, penetrations set out.
Ground slab reinforcement across a social housing site at Wagga Wagga NSW
Ground slab steel, tied and chaired to the drawing.
Ground slab reinforcement and footing cages across the Wagga Wagga housing site
Slabs and footing cages progressing across the site.
MJK Contracting steel fixer working wall reinforcement against formwork, Wagga Wagga
Ligatures and laps, checked against the schedule.
Column and wall reinforcement tied inside formwork, LAHC Wagga Wagga
Column and wall steel inside the formwork.
Column starter bars capped and tied ready for the following trade
Starters set so the next trade builds off them, not around them.
Riverina · Southern NSW