Footing beams and reinforcement set out across the excavated footprint of a new residence at Mittagong in the NSW Southern Highlands
Residential · Southern Highlands NSW

Mittagong Residence
Full Reinforcement Package

Footings, blade walls, lift pit, plant room and the waffle-pod ground slab for a new architect-designed home, delivered for One Up Building.

MITTAGONG
Southern Highlands NSW
ONE UP
Head contractor
4FIXERS
Continuous run
2026
Ground floor structure
01 — The job

One slab, eleven decisions.

A new single-level pavilion residence in the Southern Highlands. MJK installed the reinforcement across the whole ground floor structure for head contractor One Up Building.

The ground floor isn’t one flat slab. It steps across levels, wraps courtyards, and carries a lift pit, a plant room and a run of blade walls — each with its own cover requirements, laps and starter bars waiting on the next trade. Set that out wrong and the formwork crew finds out first, the certifier finds out second, and everybody loses a day standing around on pour morning.

So we work drawings first, steel second. Bar marks checked against the schedule. Cover confirmed before a single chair goes down. Starters tied so they are still where the engineer put them after the concrete is in.

The steel goes in right, the programme stays put, and the builder gets to think about something else.
02 — Getting crews to the Highlands

Turning up is the actual test.

Distance is the part builders outside the metro actually worry about. There are fewer crews to call, and a no-show on a Monday costs a week. Most reinforcement crews will quote a Highlands job. Far fewer will still be there in week three.

We mobilised four fixers to this one and kept them on it — continuous run, same faces, weekends worked to hold the pour dates. The travel and accommodation arrangement was agreed in writing before anyone got in a ute and priced into the job, so nothing arrived later as a variation.

  • Crew mobilised and kept on site for the run
  • Weekend coverage to hold the pour dates
  • Travel and accommodation agreed in writing upfront
  • White Card held by all crew
  • Insurances current and verified, certificates on request
  • 100% safety record since 2021
03 — On site

Footings, walls, ground slab.

MJK Contracting crew tying footing reinforcement cages in trenches at a Mittagong residence, Southern Highlands NSW
Footing cages checked against the schedule before a single chair goes in.
Footing and beam reinforcement set out across the excavated footprint at Mittagong NSW
Set-out and footing beams going in.
Blade wall reinforcement and starter bars set inside formwork at a Mittagong residence
Wall formwork and starter bars set for the next stage.
Close detail of tied reinforcement laps, ties and bar chairs
Laps, cover and ties. The boring part that decides everything.
Ground slab mesh and bar chairs laid over the vapour barrier at Mittagong NSW
Slab mesh and bar chairs set out over the membrane.
Ground slab reinforcement progressing across the stepped levels of a Mittagong residence
Slab reinforcement progressing across the stepped levels.
Steel fixers working ground slab reinforcement at dusk, Mittagong Southern Highlands
Still tying at last light so the pour date holds.
MJK Contracting steel fixing crew working the ground slab at a Mittagong residence
Four fixers, continuous run, no stop-start.
Waffle pods and top mesh laid over the membrane on a ground slab at Mittagong NSW
Waffle pods and top mesh going down over the membrane.
Southern Highlands · Wingecarribee

Got a slab date you’re worried about?

Send through the drawings and the programme and we’ll tell you straight whether we can hit it. Reinforcement crews across the Southern Highlands, Wollongong, the Illawarra and Greater Sydney.